Gas Panel
● Hook up panel take a lot of on-site working hours, we can provide prefabrication service for hook up panel, including take off tee and panel assembly. This service can reduce weld bead and working hours.
● Panel and tee can be connected on-site, and not limit by the raised floor (600x600mm).
● The component of panel is fabricated according to customer design drawing.
● Panel and tee can be sold separately based on customer requirement.
● Please verify the specifications of the valve and fitting according to the manufactory catalog.


Pipe and panel size are according to customer requirement.

2 TEE
3 TEE
4 TEE
5 TEE
6 TEE

● Several kinds of panel provided according to application and requirement by customer.
● Add on steel plate if required.